Strona główna

Aktualności

Aktualności

Hünnebeck Multi-Mover facilitates horizontal formwork transport

8. kwietnia 2019

At bauma 2019 in Munich, Hünnebeck will be presenting a new electric travel carriage for the horizontal transport of formwork – the Hünnebeck Multi-Mover. „Transport on the construction site is made much easier with the Multi-Mover. Its narrow dimensions and high degree of maneuverability make it very easy to move the car longitudinally, transversely and […]

Więcej

Hünnebeck EPS offers maximum side protection on building edges

8. kwietnia 2019

Working on building edges poses a particular risk during construction. A robust and reliable protective device is required here that satisfies all requirements for occupational safety. The new Hünnebeck EPS system, which Hünnebeck will be presenting at bauma 2019, impresses thanks to its high degree of functionality, easy installation and flexible application possibilities. Safety first […]

Więcej

More cost-efficient than ever: The Manto G3 wall formwork system

8. kwietnia 2019

At bauma 2019, Hünnebeck presents the Manto G3 wall formwork for the first time – the new generation of 80 kN/m² formwork system for large wall areas and rapid construction progress. High levels of functionality and durability have always been the outstanding features of this system, which is frequently used in industrial and infrastructure construction. […]

Więcej

Hünnebeck launches next generation of Rasto G2 wall formwork

8. kwietnia 2019

Hünnebeck presents Rasto G2, the next generation of its 60 kN/m² wall formwork for small to medium-sized objects, right on time for bauma. Rasto was designed primarily for residential construction. The light weight of the system allows walls to be formed by hand, but also over large areas with crane support. Innovations such as single-sided […]

Więcej

Hünnebeck as a partner for high-rise construction

8. kwietnia 2019

The booming high-rise construction sector is stimulating growth in the construction industry. Equally, it presents construction companies with complex challenges. High-rise buildings are often architectural landmarks with sophisticated geometries that require special formwork. In addition: Their locations in densely populated inner cities and in confined spaces usually prevent the use of cranes and also require […]

Więcej

Efficiency and safety for infrastructure construction

8. kwietnia 2019

Save time and money – without compromising occupational safety: This is the top priority for the construction industry when it comes to infrastructure projects. However, that is not all: Despite construction, it is vital that traffic is able to continue to flow without interruption. Hünnebeck will be presenting innovative solutions for these complex challenges at […]

Więcej

Thank you message!