Categoría: Forming and shoring

‘Feat of Engineering’ – formwork and concrete solutions for the ground-breaking Marston Box HS2 bridge job

17. abril 2023

Hünnebeck by BrandSafway and MPB Structures have been delivering formwork and concrete solutions for BBV (Balfour Beatty VINCI) and HS2 (High Speed 2) for the ground-breaking, 2600-tonne, Marston Box HS2 bridge job – the world’s longest box slide on a bridging project. MPB built the massive bridge structure over a six-month period – right next […]

Leer más

Infrastructure construction at Frankfurt Airport: Hünnebeck formwork solutions for Pier J

29. noviembre 2022

Ratingen/Frankfurt am Main Whether Frankfurt or Paris: Hünnebeck demonstrates infrastructure expertise in the current expansion and conversion of important European airports. In Frankfurt, after the completion of Pier H, the new construction of Pier J is another successful major construction site: Nine building cranes and several mobile cranes are simultaneously in use to create a […]

Leer más

Hünnebeck: High-performance formwork supplier for Europaplatz Heidelberg

20. diciembre 2021

A completely new urban quarter is being created at Heidelberg’s main railway station with the «Europaplatz» construction project. Major challenge for the shell builders: All five buildings are being constructed at the same time, which requires an optimally coordinated formwork concept. ZECH Bau SE is providing construction management for the entire building project on behalf […]

Leer más

Infrastructure construction: Hünnebeck formwork solutions for railway line

17. noviembre 2021

To the beach by metro With the 2.5 km long «Metro aan Zee» project, a consortium made up of Boskalis Nederland and Swietelsky is realising the conversion and extension of a former railway line into a metro line plus a new stop at the beach of Hoek van Holland. Hünnebeck is supplying the formwork solutions […]

Leer más

Combination of Topmax slab table and Topec modular formwork reduces construction time on the FAZ Tower

22. septiembre 2021

The shell of the new FAZ Tower in Frankfurt is almost complete. Hünnebeck’s clever slab formwork concept provided the construction company Lupp with crucial time advantages in the tightly scheduled shell construction. It is set to become the new eye-catcher in the metropolis in Hesse: The FAZ Tower, which will be approximately 60 m high, […]

Leer más

New extension to the Debeka headquarters: Rapid construction progress with a high level of occupational safety

18. mayo 2021

IG Bau recently published frightening figures: last year, 97 construction workers suffered fatal accidents on German building sites, with a total of more than 104,000 accidents. Only those working safely can work precisely and efficiently. That is why formwork developer and supplier Hünnebeck relies on its products’ «built-in» occupational safety. The current reference is the […]

Leer más

Thank you message!